Value (ProgressBar)
Description
Returns or sets the value of the progress bar as an Integer. By default, the value is 0. If the visibility is set to "true" the ProgressBar is redrawn to reflect the new position.
Note: Attempting to set the value to be greater than the maximum value will result in an "invalid argument" error.
C# Syntax
// get accessor Int32 rtn = ProgressBar.Value; // set accessor ProgressBar.Value = Int32;
Examples
VBScript Example
dim progressbar set progressbar = XSIUIToolkit.ProgressBar progressbar.Maximum = 70 progressbar.Step = 1 progressbar.CancelEnabled = false progressbar.Visible= true for i = 1 to 60 progressbar.Caption = "step" & i progressbar.Increment 1 next Application.LogMessage( progressbar.Value ) ' Expected result: 'INFO : 60
Autodesk Softimage v7.5